
Wednesday, January 20, 2010
Sunday, January 3, 2010
MoM Baner Meeting Dec 21 2009
Minutes of meetings - Baner meeting Dec 21 2009
1. Introduction of members: Memebers introduced themselves
2. Sidheswar Jena requested that the Utkal Samaj monetary collection should be systematic and should be audited so that prospective members should feel
that the organization is serious and dedicated towards the cause of Jagannath Temple. He was assured by Mr Sisir Mohapatra that all donations are handled
professionally and aslo said that the first few months would be not be very systematic due to the nature/size and maturity of the organization. Shri Jena also stressed that the "next step" should be the focus.
3. Amulya Kumar Bal and Dr Tripathy requested members to continue to donate to the Rs 500 per month scheme
4. The next meeting was decided to be held in Suturwadi in Rabinarayan Panda's house.
1. Introduction of members: Memebers introduced themselves
2. Sidheswar Jena requested that the Utkal Samaj monetary collection should be systematic and should be audited so that prospective members should feel
that the organization is serious and dedicated towards the cause of Jagannath Temple. He was assured by Mr Sisir Mohapatra that all donations are handled
professionally and aslo said that the first few months would be not be very systematic due to the nature/size and maturity of the organization. Shri Jena also stressed that the "next step" should be the focus.
3. Amulya Kumar Bal and Dr Tripathy requested members to continue to donate to the Rs 500 per month scheme
4. The next meeting was decided to be held in Suturwadi in Rabinarayan Panda's house.
Sunday, November 8, 2009
MoM - Utkal Samaj - Nov 01 -Draft
THIS IS DRAFT and is UNDER REVIEW
MoM - Utkal Samaj - Nov 01
Location: Viman NagarAttended by (List imcomplete):
1. Krishna Rath
2. Subodh Sarangi
3. Sisir Mohapatra
4. Durgeswar Bahalia
5. Srdhar Sahoo
6. A Samal
7. Sarat Kumar Swain
8. Ashish Rajan Mishra
9. Muralidhar Mahapatra
Topics:
1. Introduction: Memebers introduced themseleves.
2. Mr SK Swain mentioned that he met a few Oriya members from Anudh and they were willing to participate in the construction of Jagannath temple. He proposed to have the next meeting in Aundh.
3. Mr A Mohanty gave an overview of the contrsuction activities. The work has been stalled due to machine malfunction. Mr Swain reassured that the machine would be replaced soon or repaired soon, however, it is as per the needs of the doner of the machine.
Rs 1 lakh has already been dispatched to the stone work.
Mr M Mahapatra opened the forum to share his thoughts on how both Utkal Samaj and Jagannath temple can co-exist. He suggested that Odiyas are reluctant to pay for both Samaj and the temple, as they dont see any need to pay extra - most of the Odiyas he discussed with are with the opinion to focus on the temple. He suggested that the Utkal Samaj membership should be brought down to Rs 100/- to increase Samaj members which in turn would spread the cause of the construction of the temple. He was supported by Mr A Samal.
Dr Tripathy proposed to have every member in the room share their thoughts:
1. Dr Tripathy gave his thoughts: He clarified that that the Utkal Samaj has ben created as highest body within which there can be many projects such as the temple. He suggested that the membership fees for Utkal Samaj be Rs 500/- and other members suggested that this should be a life member - ie any member is a life member and not to have any annual or Life membership.
Dr Tripathy also clarified that there will be no regional Utkal Samaj - there would be only regional coordinators or representatives who would need to co-ordinate work in the respective areas assigned to them
Mr Biswal proposed that there much be at least 5 representatives from each region
Mr Mohnaty suggested that the representatives will attend any meeting and let the others know about the meeting, and also hold meetings to gather the views of the people.
Mr Mishra liked the idea of the Rs 500 per month for the running expenses of the temple, however, he said that the members must also give a thought to the regualrity of the collection
Mr SK Swain assured the members that the money collected will not be misused. Currently, the money will be put in Utkal Samaj account and once the Jagannath temple account is made, that account will be used for accepting donnations.
Mr Sisir Mohapatra told the audience that the website having an ECS facility is being planned and a feasibility study is currently underway. He also said that the account statements cannot be shown on the website due to regulations. The webiste will serve as a media/markerting tool.
Mr R Mahapatra- focus should be on Jagannath Temple. The membership drive needs to be better. Any amount donated for the temple should be accepted. There should be transperacny and goverance espcily on the money being collected as people should not lose their faith in the system.
Mr Bahalia supported the representative idea.
Mr S Sahoo - He said that the wesbite contrsuction is getting nearer to completion. He suggested that the responsibilities and Account should be made clear, there is practically no action seen after several meetings. He suggest that once the Jagannath temple trust is made, all Utkal Samaj members must be made members of the temple.
Mr Samal stressed that the income-expenditure reports need to be discussed in detail. He supported the continuation of the Rs 500 collection scheme.
Mr A Mohanty requested for better and newer receipts books, he is currently collecting money and writing them in a notebook.
Mr S Sarangi stressed that the larger donnations could be received from people who are already runing religious sessions/activities.
Mr A Dash expressed his concern over the temple trust registration begin so slow and suggested that new receipts books be published as soon as possible.
Mr L Panda shared his thoughts on his experience in the Bangalore Jagannath temple and said that donnations in kind can be accepted - example if a person wishes to contribute 2 bags of cement. He also stressed on an effective collection mechanism.
Mr G Panda requested the project to be taken just like a professional project and to have a master plan which would be broken down into smaller pieces. He also said that clear responsibilities should be given to people.
Mr K Rath said that he has nothing to add, however would share his comments in the next meeting.
It was decided that the following members would be representatiing the "Dhanori" region as defined in the previous meeting.:
Mr M Mahapatra
Mr A Samal
Mr BK Gouda
Mr A Sahu
The Viman Nagar area has been decided as Viman Nagar, Chandan Nagar, Kharadi, Wadgaonsheri, Somnath Nagar, Ganesh Nagar.
The representaives would be Mr LK Sahoo, Mr BB Mohanty, Mr GB Giri.
The next meeting would be in Nov-15 at Aundh.
Sunday, October 18, 2009
Meetings of Meetings - 18- Oct- 2009


Above are two pictures of the meeting: The display of the hand painting of the much awaited Jagannath temple! The painting tool the artists 15 days to create.
Utkal Samaj Meeting: 18-Oct-2009
Venue: Dhanori,
Mr M. Mahapatra's house
Attended by:
1. Mr Triluchan Biswal
2. Mr L K Sahoo
3. Mr K C Das
4. Mr A K Mohanty
5. Mr TK Pradhan
6 Mr S R Sunkara
7. Mr B Sahoo
8. Mr C Barik
9 Mr A C Sahoo
10. Mr A K Bal
11. Dr L K Tripathy
12 Mr BK Gouda
13 Mr A K Samal
14 Mr B Biswal
15 Mr P K Dash
16 Mr A Sahu
17 Mr D Das
18 Mr B K Jena
19. Mr K Rath
Events:
1. Participants introduced themselves
2. Dr LK Tripathy gave a presentation of last week's meeting.
3. Updates on Utkal Samaj activities- Temple progress: By A K Bal.
A K Bal said that the purpose of having meetings at various places was to gather more members for Utkal Samaj and to create division/branches of Utkal Samaj which would help the growth of the larger cause of Odiya's in Pune. He thanked the participation of the Air Force community in the various functions held in the past, including the Sri Jagannath Temple pujas. He highlighted that earth escavation work in the Temple land is done free of cost as was with the Architects. He urged Odiyas to come forward and help in increasing the membership for Utkal Samaj as well as contribute to the construction of the temple. He requested the audience to share their views on the Rs 500 per month Scheme . Dr LK Tripathy opened the floor for discussion.
Mr C Barik asked if the amount of Rs 500 was fixed, as his concern was that there maybe people who may not be able to afford that much money and may not contribute. Mr AK Bal and Mr PK Dash stressed that the Amount is immaterial, however, what is important is the "Recurring" deposit.
Mr BK Gauda supported the scheme saying that the scheme is good however the amount should depend on the person's monetary capacity.
Temple Progress: Mr AK Bal narrated the incidents behind the decision of constructing the temples in stone - as per the wishes of the main donators. Mr Bal also shared that during his visit to Puri, he met a group that would help in the stone work. They have already sent in the temple drawing which was displayed to the audience.
Mr PK Dash urged the audience that this temple is for all Odiyas and not any personal property and asked the audience on how each can contribute. Mr A Sahu asked for a clarification on the money that would be collected for the Utkal Samaj memebership and asked if this money woud be used for the temple. Mr Bal and Dr Tripathy replied that the membership fees would be put in Fixed Deposit and the interest earned would be used for holding Utkal Samaj functions.
Mr AK Bal and Mr AK Dash proposed that Dhanori and surrounding areas should have a local Utkal Samaj whose representative would help facilitate the growth of Utkal Samaj. This was accepted by all the members present. It was decided that Mr Ajaya Kumar Samal and Mr Murlidhar Mahapatra would lead the Lohegaon sector - This sector would include areas of Dhanori, Lohegaon, Vishrantwadi, Tingre Nagar, Sant Nagar and Gurudwar Nagar.
Dr LK Tripathy handed over 17 membership forms to Mr Samal.
The form for the Sri Jagannath Trust was submitted on Oct-14th. It will take about a month of the formalities to get completed.
The following people have in principle agreed to become member of Utkal Samaj, Pune for the Lohegaon sector:
1. Mr K C Das
2. Mr B Biswal
3. Mr T Biswal
4. Mr BK Gaud
5. Mr S Sunkara
6. Mr A Sahu
7. Mr BK Jena
8. Mr DN Das
9. MrMurlidhar Mahapatra
10. Mr B P Sahoo
11. Mr S Sahu
12. Mr D Routary.
The venue of the next meeting will be in Vinman Nagar in Mr L K Sahoo's house. For exact venue please email utkalsamajpune@gmail.com The details are not published on the internet for privacy issues.
Sunday, October 4, 2009
Utkal Samaj Minutes of Meeting - Oct 04 2009
Utkal Samaj Minutes of Meeting - Oct 04 2009
Location: Ordinance Factory Hospital, Khadki
1. Introductions: The participants introduced themeseleves.
2. Shri Amulya Kumar Bal, president, Utkal Samaj gave updates of the temple
construction progress. He stressed that the registration of trust was
important and most of the other tasks needed for the construction of the
temple depended on the registration of the trust.
He has said that the following activities need to happen as soon as possible
- Drawing of the construction
- Water and electricity at the site
- Selection of Supervisor.
- Preparation of brochure
He said that the monthly expenditure of Rs 10 Lakhs will need to be funded
for activties to happen smoothly.
3. Dr P K Rath suggested if it was possible to have the temporary temple built first
and then have the rest of the temples built. Shri Bal replied that there was a provision
for a temporray temple, however, it would also be best to have the Ganesh Temple
built, as was followed in Chennai model.
Follow ups for the next meeting:
1. Trust registration - Status update - Dr LK Tripathy
2. Bank account for Jagannath Temple: Shri AK Bal to open/lead the account opening
3. Everyone in the meeting to contribute to the Rs 500 per month scheme and also
bring a list of other Oriya memebers who would contribute to the scheme.
4. The next meeting would be on Sunday, 18th Oct - the Venue will be finalized by
Shri AK Dash.
Monday, September 21, 2009
GO Green Drive


Utkal Samaj THANKS the Rotary club of Hadapsar to spend the Sunday morning by the whole hearted participating in kind and spirit for the "Go Green Drive".
Sunday, August 16, 2009
Jagannath Temple Work has started!





The work at the Jagannath temple has started! Yes! It has. The excavation work started on August 14th. Utkal Samaj blog site will now bring weekly updates on the progress of the the construction work.
For those who believe in seeing than hearing, here are some pictures! And please please do visit the temple construction site to get the feeling of what is being built.
We know that you are also willing to contribute. On how you can, please call 9823252848, Utkal Samaj number.
We are now in a drive to collect funds. Please do contribute generously so that we all can have the temple constructed as soon as possible.
A very high level plan is to now have the temporary temple built, while the main temple work will take place in parallel. The main temple (whose details will be posted soon), will take about 7 to 10 years to build. In the meanwhile the temporary temple will function.
For more details please call 9823252848, Utkal Samaj number. or email utkalsamajpune@gmail.com
Subscribe to:
Posts (Atom)